Exhibit 10.16
AIA DOCUMENT Alll-1997 Standard Form of Agreement Between Owner and Contractor where the basis for payment is the COST OF THE WORK PLUS A FEE with a negotiated Guaranteed Maximum Price
A G R E E M E N T made as of the Sixteenth day of June This document has important in the year Nineteen Hundred Ninety-Nine legal consequences. Consultation (In words, indicate day, month and year) with an attorney is encouraged
with respect to its
completion or modification.
BETWEEN the Owner: Bank of the Ozarks This document is not (Name, address and other information) P.O. Box 8811 intended for use in
Little Rock, AR 72231 competitive bidding.
and the Contractor: East-Harding, Inc. AIA Document A201-1997, (Name, address and other information) 2230 Cottondale Lane, Suite 3 General Conditions of the
Little Rock, AR 72202 Contract for Construction
is adopted in this document
by reference.
The Project is: Bank of the Ozarks This document has been (Name and address) North Little Rock Branch approved and endorsed
North Hills Blvd. by The Associated General
North Little Rock, AR Contractors of America.
The Architect is: AMR Architects, Inc. (Name, address and other information) 201 East Markham, Ste. 150
Little Rock, AR 72201
The Owner and Contractor agree as follows.
ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 15. If anything in the other Contract Documents is inconsistent with this Agreement, this Agreement shall govern.
ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others. 1. Telephone & Data Cabling N.I.C. 2. Bank Equipment & Vault - N.I.C 3. Exterior & Interior Signage - N.I.C.
ARTICLE 3 RELATIONSHIP OF THE PARTIES The Contractor accepts the relationship of trust and confidence established by this Agreement and covenants with the Owner to cooperate with the Architect and exercise the Contractor's skill and judgment in furthering the interests of the Owner; to furnish efficient business administration and supervision; to furnish at all times an adequate supply of workers and materials; and to perform the Work in an expeditious and economical manner consistent with the Owner's interests. The Owner agrees to furnish and approve, in a timely manner, information required by the Contractor and to make payments to the Contractor in accordance with the requirements of the Contract Documents.
ARTICLE 4 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement, if it differs from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed.)
If, prior to commencement of the Work, the Owner requires time to file mortgages, mechanic's liens and other security interests, the Owner's time requirement shall be as follows:
4.2 The Contract Time shall be measured from the date of commencement.
Commencement is based upon work by others to establish an approved building pad being completed.
4.3 The Contractor shall achieve Substantial Completion of the entire Work not later than (150) Calendar days from the date of commencement, or as follows: (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of commencement. Unless stated elsewhere in the Contract Documents, insert any requirements for earlier Substantial Completion of certain portions of the Work.)
, subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to complete on time, or for bonus payments for early completion of the Work.)
ARTICLE 5 BASIS FOR PAYMENT 5.1 CONTRACT SUM 5.1.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum is the Cost of the Work as defined in Article 7 Plus the Contractor's Fee.
5.1.2 The Contractor's Fee is: (State a lump sum, percentage of Cost of the Work or other provision for determining the Contractors Fee, and describe the method of adjustment of the Contractors Fee for changes in the Work.)
5% of the Final Actual Cost
5.2 GUARANTEED MAXIMUM PRICE 5.2.1 The sum of the Cost of the Work and the Contractor's Fee is guaranteed by the Contractor not to exceed Six Hundred Forty-two Thousand, Six Hundred Thirty Seven Dollars $642,637.00, subject to additions and deductions by Change Order as provided in the Contract Documents. Such maximum sum is referred to in the Contract Documents as the Guaranteed Maximum Price. Costs which would cause the Guaranteed Maximum Price to be exceeded shall be paid by the Contractor without reimbursement by the Owner. (Insert specific provisions if the Contractor is to participate in any savings.)
100% Savings Given to Owner
5.2.2 The Guaranteed Maximum Price is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If decisions on other alternates are to be made by the Owner subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when the amount expires.)
1. Alternate No. 1 - Omit Fry Reglets 2. Alternate No. 2 - Change Maple Wood Ceiling to suspended acoustical in Foyer
#100 & partial area in #109 3. Alternate No. 3 - To use Metalogic roof system in lieu of specified
5.2.3 Unit prices, if any, are as follows:
5.2.4 Allowances, if any, are as follows: (Identify and state the amounts of any allowances, and state whether they include labor, materials, or both.)
Landscape & Irrigation Allowance $12,000.00
5.2.5 Assumptions, if any, on which the Guaranteed Maximum Price is based are as follows:
Work performed by other General Contractor to be all inclusive of the following: 1. Site excavation, including building pad and all other areas to required
subgrade. Specified compaction & testing included. 2. Curb & sidewalks outside of building immediate perimeter, including curbs,
walks & aprons at street. 3. Asphalt paving & Markings. 4. Storm drainage & structures. 5. Water & Sewer Mains including taps & fees.
5.2.6 To the extent that the Drawings and Specifications are anticipated to require further development by the Architect, the Contractor has provided in the Guaranteed Maximum Price for such further development consistent with the Contract Documents and reasonably inferable therefrom. Such further development does not include such things as changes in scope, systems, kinds and quality of materials, finishes or equipment, all of which, if required, shall be incorporated by Change Order.
ARTICLE 6 CHANGES IN THE WORK
6.1 Adjustments to the Guaranteed Maximum Price on account of changes in the Work may be determined by any of the methods listed in Subparagraph 7.3.3 of AIA Document A207-1997.
6.2 In calculating adjustments to subcontracts (except those awarded with the Owner's prior consent on the basis of cost plus a fee), the terms "cost" and "fee" as used in Clause 7.3.3.3 Of AIA Document A207-1997 and the terms "costs" and "a reasonable allowance for overhead and profit" as used in Subparagraph 7.3.6 of AIA Document A201-1997 shall have the meanings assigned to them in AIA Document A201-1997 and shall not be modified by Articles 5, 7 and 8 of this Agreement. Adjustments to subcontracts awarded with the Owner's prior consent on the basis of cost plus a fee shall be calculated in accordance with the terms of those subcontracts.
6.3 In calculating adjustments to the Guaranteed Maximum Price, the terms "cost" and "costs" as used in the above-referenced provisions of AlA Document A201-1997 shall mean the Cost of the Work as defined in Article 7 of this Agreement and the terms "fee" and "a reasonable allowance for overhead and profit" shall mean the Contractor's Fee as defined in Subparagraph 5.1.2 of this Agreement.
6.4 If no specific provision is made in Paragraph 5.1 for adjustment of the Contractor's Fee in the case of changes in the Work, or if the extent of such changes is such, in the aggregate, that application of the adjustment provisions of Paragraph 5.1 will cause substantial inequity to the Owner or Contractor, the Contractor's Fee shall be equitably adjusted on the basis of the Fee established for the original Work, and the Guaranteed Maximum Price shall be adjusted accordingly.
ARTICLE 7 COSTS TO BE REIMBURSED 7.1 COST OF THE WORK The term Cost of the Work shall mean costs necessarily incurred by the Contractor in the proper performance of the Work. Such costs shall be at rates not higher than the standard paid at the place of the Project except with prior consent of the Owner. The Cost of the Work shall include only the items set forth in this Article 7.
7.2 LABOR COSTS 7.2.1 Wages of construction workers directly employed by the Contractor to perform the construction of the Work at the site or, with the Owner's approval, at off-site workshops.
7.2.2 Wages or salaries of the Contractor's supervisory and administrative personnel when stationed at the site with the Owner's approval. (If it is intended that the wages or salaries of certain personnel stationed at the Contractor's principal or other offices shall be included in the Cost of the Work, identify in Article 14 the personnel to be included and whether for all or only part of their time, and the rates at which their time will be charged to the Work.)
7.23 Wages and salaries of the Contractor's supervisory or administrative personnel engaged, at factories, workshops or on the road, in expediting the production or transportation of materials or equipment required for the Work, but only for that portion of their time required for the Work.
7.2.4 Costs paid or incurred by the Contractor for taxes, insurance, contributions, assessments and benefits required by law or collective bargaining agreements and, for personnel not covered by such agreements, customary benefits such as sick leave, medical and health benefits, holidays, vacations and pensions, provided such costs are based on wages and salaries included in the Cost of the Work under Subparagraphs 7.2.1 through 7.2.3.
7.3 SUBCONTRACT COSTS 7.3.1 Payments made by the Contractor to Subcontractors in accordance with the requirements of the subcontracts.
7.4 COSTS OF MATERIALS AND EQUIPMENT INCORPORATED IN THE COMPLETED CONSTRUCTION
7.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in the completed construction.
7.4.2 Costs of materials described in the preceding Subparagraph 7.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner's property at the completion of the Work or, at the Owner's option, shall be sold by the Contractor. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work.
7.5 COSTS OF OTHER MATERIALS AND EQUIPMENT, TEMPORARY FACILITIES AND RELATED ITEMS
7.5.1 Costs, including transportation and storage, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment, and hand tools not customarily owned by construction workers, that are provided by the Contractor at the site and fully consumed in the performance of the Work; and cost (less salvage value) of such items if not fully consumed, whether sold to others or retained by the Contractor. Cost for items previously used by the Contractor shall mean fair market value.
7.5.2 Rental charges for temporary facilities, machinery, equipment, and hand tools not customarily owned by construction workers that are provided by the Contractor at the site, whether rented from the Contractor or others, and costs of transportation, installation, minor repairs and replacements, dismantling and removal thereof. Rates and quantities of equipment rented shall be subject to the Owner's prior approval.
7.5.3 Costs of removal of debris from the site.
7.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, telephone service at the site and reasonable petty cash expenses of the site office.
7.5.5 That portion of the reasonable expenses of the C ...