Financing (Debt Related)  >  Promissory Notes  >  Consumer Products (Non-Durables)  >  Agreement Preview
Agreement#: AG-319723
Pages: 26 pages
Format: MS Word, WordPerfect and other RTF formats are supported. MS Word Compatible
Price: $35.00
Click the "Add To Cart" button to download the full agreeement.
Add To Cart


Change Order No. 1 To Agreement For Guarantee Maximum Price Construction Services

Parties:

WYNN Resorts

Sectors: Leisure and Entertainment
Governing Law:  The United Kingdom
Exhibit 10.3

AMENDED AND RESTATED

DESIGN-BUILD AGREEMENT FOR GUARANTEED MAXIMUM PRICE ARCHITECTURAL, ENGINEERING AND CONSTRUCTION SERVICES

DATED SEPTEMBER 14, 2005

CHANGE ORDER AND AMENDMENT 10 MARCH 2006


Project: Wynn Resorts Macau

Change Order No.: 1

" Contractor" : jointly and severally: LEIGHTON CONTRACTORS (ASIA) LIMITED 39 th Floor, Sun Hung Kai Centre

30 Harbour Road North Wanchai

Hong Kong

" Owner" : WYNN RESORTS (MACAU) S.A.

335-341, Alameda Dr. Carlos d' Asumpcao

9 th Floor, Hotline Centre

Macau

CHINA STATE CONSTRUCTION ENGINEERING (HONG KONG) LIMITED 29 th Floor, China Overseas Building

139 Hennessy Road Hong Kong

CHINA CONSTRUCTION ENGINEERING (MACAU) COMPANY LIMITED

Rua do Campo No. 78

Edificio Commercial Zhang Kian, 18 andar Macau

Pursuant to Article XVIII of that certain Amended and Restated Design-Build Agreement for Guaranteed Maximum Price Architectural, Engineering and Construction Services between Owner and Contractor for the design and construction of a luxury resort/hotel/casino complex in Macau known as Wynn Resorts Macau, executed and delivered as a deed on September 14, 2005 (the " Contract" ), and the desire of the Owner and Contractor to amend and supplement certain terms and provisions of the Contract, the Contract is hereby modified by this agreement and all related drawings, plans and specifications attached hereto (collectively, the " Change Order" ), made as a deed effective as of the date set forth above:


1

Scope of Work. The Scope of Work is changed as follows; 1. Revised Elevator Lobby

Location: Front of House Hotel Lobby

The entry to the Hotel Public Lift Lobby is revised to improve traffic flow and increase exposure to the retail space. The side elevation of Retail Space 5, facing the lobby, is revised from glass to interior de9cor consistent with the surrounding lobby. The side elevation to Retail 6A, facing the Hotel Public Lift Lobby, is revised to glass. Change Request Form: 106

Design Action Notification: DAN/0001

Increase to the Guaranteed Maximum Price: HK$ 40,000/ USD 5,128 2. Convert Spa single rooms to doubles

Location: Spa & Health Club in Level 1

The layout of the Spa and Health Club is revised to incorporate a pair of enlarged relaxation rooms for couples in place of the original four single relaxation rooms. Two additional single relaxation rooms are added adjacent to the lounges. Finishes to the Spa Manager' s office are upgraded to front of house standard.

Change Request Form: 107

Design Action Notification: DAN/ 002

Increase to the Guaranteed Maximum Price: HK$ 353,561/ USD 45,329 3. Additional service counters and Points of Sale.

Location: Grand Cafe9, Japanese Restaurant, Noodles Restaurant, Food Court, VIP dining and Italian Restaurant.

Additional service counters with point of sale provisions are included to the various restaurants and food outlets as follows:

Grand Cafe9

Japanese Restaurant

Noodles Restaurant

Food Court

VIP Dining

Italian Restaurant

Change Request Form: 109

Design Action Notification: DAN/ 003 Increase to the Guaranteed Maximum Price: HK$ 142,500/ USD 18,270


2

4. Relocation of Satellite Bank Location: South Side Back of House Area

The Satellite Bank is relocated from the Ground Floor (GL 18/F-1) into the unassigned area at the First Floor (GL 17/ C-4). A new cart storage area is added adjacent to the cage to be connected to the Satellite bank above via a vertical shaft with a dumb waiter.

Change Request Form: 110

Design Action Notification: DAN/ 004

Increase to the Guaranteed Maximum Price: Nil 5. Employees' Kiosk

Location: First Floor, South Side, Back of House Area.

Employee kiosks (2nr) are added adjacent to the Health Care Centre and Satellite Bank respectively.

Change Request Form: 113

Design Action Notification: DAN/ 006

Increase to the Guaranteed Maximum Price: HK$ 120,000/ USD 15,385 6. Observation Room layout

Location: First Floor, I.T Department

The layout of the Observation Room is rearranged to create additional space for security staff and monitoring equipment.

Change Request Form: 115

Design Action Notification: DAN/ 017

Increase to the Guaranteed Maximum Price: HK$ 27,500/ USD 3,526 7. Chinese Restaurant

Location: Ground Floor, Chinese Restaurant

The layout and interior design of the restaurant is revised. The revised design incorporates a separate entrance to allow public officials and families with minors to access from outside the Casino. The layout and seating plan to the restaurant are revised accordingly.

Change Request Form: 116

Design Action Notification: As set out in the various revised drawings listed in Appendix A to this Change Order No.1.

Increase to the Guaranteed Maximum Price: Nil

3

8. Casino Lounge

Location: Ground Floor, Casino Lounge

The layout and interior design of the Casino Lounge is revised to allow inclusion of the separate entry to the Chinese Restaurant which bypasses the Casino. The Casino Lounge area will also function as the entrance/ waiting area for the Chinese Restaurant with access from the Casino side. Change Request Form: 117

Design Action Notification: As set out in the various revised drawings listed in Appendix A to this Change Order No.1.

Increase to the Guaranteed Maximum Price: Nil

9. End Suite to be upgraded to Villas

Location: Hotel End Suites (S2s)

The interior de9cor to Hotel End Suites (S2s) from floors 13 to 22 (10 nr) is upgraded.

Change Request Form: 118

Design Action Notification: DAN/ 0018

Increase to the Guaranteed Maximum Price: HK$ 6,120,528/ USD 784,684

10. Power and mounting support for External Retail Signage

Location: Exterior Fae7ade at North Elevation

Power provisions added for 3nr exterior retail signs at North Elevation . Signage is to be provided by retailers.

Change Request Form: 119 Design Action Notification: DAN/ 0013

Increase to the Guaranteed Maximum Price: HK$ 110,000/ USD 14,103


4

11. Hotel Main Entry layout

Location: Main Hotel Entrance

The Hotel Main Entry is revised to incorporate a revolving door.

Change Request Form: 122

Design Action Notification: DAN/ 0007

Increase to the Guaranteed Maximum Price: HK$ 250,000/ USD 32,052 12. Coat Check-in and Storage

Location: First Floor, Meeting Rooms

A separate coat check-in and storage area is added adjacent to the Main Meeting Rooms at the First Floor GL 20/ V-T.

Change Request Form: 123

Design Action Notification: DAN/ 0014

Increase to the Guaranteed Maximum Price: HK$ 50,000/ USD 6,410 13. Hotel Registration Counter

Location: Hotel Main Registration Counter

Provision of additional cooling fans to the Main Registration counter to meet cooling requirements of I.T Equipment.

Change Request Form: 125

Design Action Notification: DAN/ 0046

Increase to the Guaranteed Maximum Price: HK$ 76,000/ USD 9,744 14. VIP Manager' s Office / pantry

Location: Ground Floor, VIP Area

The private dining room to the VIP Casino is deleted and is replaced with a VIP Manager' s Office, dry pantry and connecting corridor.

Change Request Form: 126 Design Action Notification: DAN/ 0019

Increase to the Guaranteed Maximum Price: HK$ 67,000/ USD 8,590


5

15. VIP Registration Counter Location: Ground Floor, VIP Registration

Minor changes to registration counter design to accommodate operating equipment requirements.

Change Request Form: 127

Design Action Notification: As set out in the various revised drawings listed in Appendix A to this Change Order No.1. Increase to the Guaranteed Maximum Price: Nil

16. Cashier stations for restaurants

Location: Ground Floor, Chinese Restaurant, Grand Cafe, Japanese Restaurant, Noodles Restaurant and First Floor, Italian Restaurant.

Cashier stations are added to the kitchens within the following restaurants: Chinese Restaurant

Grand Cafe9

Japanese Restaurant

Noodles Restaurant

Italian Restaurant

Change Request Form: 130

Design Action Notification: DAN/ 008 Increase to the Guaranteed Maximum Price: HK$ 75,075/ USD 9,625

17. Refrigerated wine cabinets

Location: First Floor, Italian Restaurant Refrigerated wine coolers (4nr) are included at the Italian Restaurant. These are to be housed in millwork at the back of the drinks bar.

Change Request Form: 132

Design Action Notification: DAN/ 0057

Increase to the Guaranteed Maximum Price: HK$ 200,000/ USD 25,641

6

18. Power and data for additional ATMs Location: Podium Areas

Power and data provisions are included for additional ATMs at the following locations:

Chinese Restaurant 1nr Food Court 1nr

Retail Promenade 2nr

Staff Dining 2nr

Change Request Form: 133

Design Action Notification: DAN/ 0015 Increase to the Guaranteed Maximum Price: HK$ 30,000/ USD 3,831

19. Re-design Spa lockers

Location: First Floor, Spa & Health Club The detail of the changing room lockers is revised to accommodate hanging of coats within individual lockers. Change Request Form: 135

Design Action Notification: DAN/ 0016

Increase to the Guaranteed Maximum Price: HK$ 52,000/ USD 6,667 20. Exterior entry from Pool side

Location: Ground Floor, Japanese Restaurant

A separate entrance is provided at the pool side, which will allow access to public officials and minors without entering the Casino.

Change Request Form: 138

Design Action Notification: DAN/ 0020

Increase to the Guaranteed Maximum Price: Nil

7

21. Enlarge width of connecting door Location: All levels of the Hotel Tower

The width of doors connecting the standard guest rooms corridor to VIP Room corridor are increased to allow easier access for house keeping services carts.

Change Request Form: 139

Design Action Notification: DAN/ 0009 Increase to the Guaranteed Maximum Price: HK$ 15,000/ USD 1,923

22. Spare toilet roll holder and retractable clothes line

Location: All typical guest rooms in Tower

Provision of a retractable clothes line and an additional toilet roll holder to all bathrooms. Change Request Form: 140

Design Action Notification: DAN/ 0021

Increase to the Guaranteed Maximum Price: HK$ 270,000/ USD 34,616 23. Additional towel rings

Location: Hotel End Suites (S2s)

Provision of an additional hand towel ring at the powder rooms of all End Suites (S2s). Change Request Form: 141

Design Action Notification: DAN/ 0022

Increase to the Guaranteed Maximum Price: Nil 24. Security Monitor Room layout

Location: First Floor, Security Monitor Room

The Security (Monitor Room) and adjacent unassigned space are combined into a single enlarged Monitor room and the interior and equipment layout is revised as shown on marked up drawing WRM/186.01 rev.0 attached with the CRF 142.

Change Request Form: 142

Design Action Notification: DAN/ 0010

Increase to the Guaranteed Maximum Price: HK$ 33,000/ USD 4,231


8

25. Lost & Found Room layout Location: First Floor, Lost and Found Room

The room layout is revised and a service window, with security grille, and additional racking are provided.

Change Request Form: 143

Design Action Notification: DAN/ 0011

Increase to the Guaranteed Maximum Price: HK$ 60,000/ USD 7,692

26. E&M provision for Post Mix

Location: First Floor, Back of House Area

Post mix provisions for the Podium Food and Beverage outlets are revised. The change involves provision of 4 nr stand alone systems for the Casino Service and a centralized system to serve the Staff Dining facility. Post mix equipment is to be supplied and installed by the operator with additional electrical and mechanical provisions for functioning of the equipment to be provided by the Contractor. Change Request Form: 145

Design Action Notification: DAN/ 0067

Increase to the Guaranteed Maximum Price: HK$ 150,000/ USD 19,231 27. E&M provision for additional TVs

Location: First Floor, Health Club & Spa

Power and signal cable provision is added for LCD TV screens at two locations.

Change Request Form: 146

Design Action Notification: DAN/ 0012

Increase to the Guaranteed Maximum Price: HK$7,500/ USD 962 28. Additional power points and shelving

Location: Ground Floor, Hotel Service Kitchen

Shelving and power provision is added for an additional 11 nr hot boxes at the Hotel service kitchen.

Change Request Form: 147

Design Action Notification: DAN/ 0023

Increase to the Guaranteed Maximum Price: HK$ 45,000/ USD 5,769


9

29. Installation of whiteboards Location: First Floor, Business Centre & Executive Office

The original presentation rails to these rooms are cancelled. The Owner will provide whiteboards to be installed by the Contractor.

Change Request Form: 148

Design Action Notification: DAN/ 0047 Increase to the Guaranteed Maximum Price: Nil

30. E&M provision for additional LCD display

Location: Ground Floor, Public Areas Power and data provisions are added for LCD displays (Janus boards) at two ground floor locations. Change Request Form: 149

Design Action Notification: DAN/ 0048

Increase to the Guaranteed Maximum Price: HK$7,500/ USD 962 31. Power points provision for fly exterminators

Location: All kitchens

Provision for a total of 22nr additional fly exterminators to be provided in the kitchens. Change Request Form: 152

Design Action Notification: DAN/ 0024

Increase to the Guaranteed Maximum Price: HK$115,000/ USD 14,744 32. Change door opening

Location: Hotel Retail Space 11 and 12

The store area in retail space 11 is reassigned to Retail Space 12. The change involves moving the store door opening to a new position within Retail Space 12.

Change Request Form: 154 Design Action Notification: DAN/ 0025

Increase to the Guaranteed Maximum Price: Nil


10

...

*End of Preview*
Click the 'Add to Cart' button to download the complete and formatted agreement.

Agreement#: AG-319723
Pages: 26 pages
Format: MS Word MS Word Compatible
Price: $35.00
Add To Cart